12
Total Deliverables
9
Completed
2
In Review
1
In Progress

📊 Section Overview

Section 10.5 covers all data pipelines, transformation logic, and final output deliverables for the reporting module. This includes raw ingestion specs, processed datasets, visualization assets, and API endpoints for downstream consumption.

  • All data follows the Q-Standard Schema v2.4
  • Delivery format: JSON, Parquet, and PNG/SVG exports
  • Encryption: AES-256 at rest, TLS 1.3 in transit
  • Retention: 90 days hot storage, 365 days cold archive

🔗 Data Flow

Source → Ingestion API → Transformation Layer → Validation → Storage → Delivery Endpoints

pipeline_id: "q-horizon-10.5"
status: "active"
throughput: 2.4M events/hr
latency_p99: 42ms

📁 Asset Registry

  • /raw/ - Unprocessed event logs
  • /processed/ - Cleaned & aggregated datasets
  • /exports/ - Visualization renders & reports
  • /docs/ - Schema references & API specs

🗂️ Data Schema Definitions

Core entity structures used across the 10.5 module. All fields are strictly typed and validated via Zod schemas before ingestion.

EventRecord { id: uuid_v4 | required, timestamp: iso_8601 | required, source: string[1..64] | required, metrics: { latency: float, throughput: integer, error_rate: float [0..1] } | required, tags: string[] | optional }

Validation rules are enforced at the edge. Failed records are routed to /dead-letter/ for manual review.

📦 Deliverables Tracker

Deliverable Format Owner Due Status Access
Raw Event Logs (Oct) Parquet Data Ops Oct 28 Complete Download →
Aggregated Metrics Dataset JSON/CSV Analytics Oct 30 In Review Preview →
Dashboard Visualizations PNG/SVG Design Nov 01 In Progress Figma →
API Integration Docs Markdown DevRel Nov 03 Draft Edit →
Security Audit Report PDF SecOps Nov 05 Draft Pending →

📅 Milestones & Checkpoints

Oct 15, 2025
Schema v2.4 Published
Finalized entity definitions and validation rules. Peer-reviewed by core engineering.
Oct 18, 2025
Pipeline Ingestion Live
Kafka consumers deployed. Latency benchmarks met (<50ms p99).
Oct 22, 2025
Mid-Sprint Review
Stakeholder alignment on data quality thresholds. Minor schema adjustments approved.
Oct 28, 2025
Full Data Export Ready
Complete Parquet/JSON bundles packaged. Checksums verified.
Nov 01, 2025
Client Delivery & Sign-off
Final asset handover, documentation review, and sprint closure.