Project Timeline & Milestones

Your implementation follows a structured deployment schedule. Each phase includes site verification, equipment validation, and stakeholder sign-offs.

Week 1-2

Site Preparation & Permitting

Finalize zoning approvals, grid interconnection agreements, and site clearance. Civil works initiated.

Week 3-4

Equipment Delivery & Staging

PV modules, inverters, battery arrays, and mounting structures delivered to site. Quality inspection completed.

Week 5-8

Core Installation & Wiring

Structural mounting, electrical conduit routing, inverter placement, and DC/AC wiring. Daily progress reports submitted.

Week 9-10

Commissioning & Testing

System energization, performance ratio verification, SCADA integration, and safety inspections.

Week 11

Client Handover & Training

Documentation transfer, operator training, portal access activation, and warranty registration.

Implementation Checklist

Track your action items and required sign-offs. Click checkboxes to mark completion.

  • Review & approve final engineering drawings
  • Sign site access & safety compliance forms
  • Provide utility interconnection approval letter
  • Schedule mid-installation walkthrough
  • Verify storage system battery placement clearance

Technical Specifications & Scope

This section outlines the exact hardware, software, and integration parameters approved in Phase 2.

Energy Generation

  • Solar Array: 1.2 MWp Monocrystalline Bifacial Modules (Tier 1)
  • Wind Turbines: 2x 850kW Micro-Hydro Hybrid Units
  • Inverters: 4x 300kW String Inverters with MPPT Optimization

Storage & Grid Integration

  • Battery System: 500kWh Lithium Iron Phosphate (LFP) Racks
  • Smart Controller: Verdantix EnergyOS v3.2 with AI Load Balancing
  • Monitoring: Real-time SCADA dashboard & mobile API access