Active Certifications 6
View All CertificatesISO 9001:2015
Quality Management System certification covering all manufacturing and engineering operations.
AS9100D
Aerospace Quality Management System for design, development, production, and installation.
ISO 13485:2016
Medical devices Quality Management System — regulatory purposes certification.
ISO 14001:2015
Environmental Management System certification for sustainable manufacturing practices.
IATF 16949:2016
Automotive QMS specification for design, development, production, and related service parts.
ISO 45001:2018
Occupational Health & Safety Management System for workplace safety excellence.
Quick Access
Quality Policy Statement
Our commitment to quality and continuous improvement in manufacturing.
Management Review Report
Quarterly review of QMS performance, customer satisfaction, and objectives.
Corrective Action Procedures
Non-conformance and corrective action handling process documentation.
Supplier Audit Reports
Evaluation and approval records for our qualified supplier network.
Calibration Certificates
Equipment and instrument calibration records and schedules.
Training Records
Employee competency training matrices and certification records.
Document Catalog
| Document | Version | Status | Category | Last Updated | Actions |
|---|---|---|---|---|---|
|
Quality Manual
MC-QM-001
|
Rev 5.2 | Current | Manual | Dec 15, 2024 |
|
|
Document Control Procedure
MC-DP-002
|
Rev 3.1 | Current | Procedure | Nov 28, 2024 |
|
|
Internal Audit Procedure
MC-DP-003
|
Rev 2.4 | Current | Procedure | Nov 10, 2024 |
|
|
Corrective Action Procedure
MC-DP-004
|
Rev 4.0 | Current | Procedure | Oct 22, 2024 |
|
|
Non-Conformance Report Form
MC-FRM-010
|
Rev 2.0 | Current | Form | Oct 05, 2024 |
|
|
Management Review Procedure
MC-DP-008
|
Rev 3.0 | Current | Procedure | Sep 18, 2024 |
|
|
Risk Assessment Procedure
MC-DP-012
|
Rev 1.3 | Draft | Procedure | Dec 01, 2024 |
|
|
Quality Objectives & KPI Tracker
MC-REC-020
|
Rev 6.0 | Current | Record | Dec 20, 2024 |
|
| Document | Version | Status | Category | Last Updated | Actions |
|---|---|---|---|---|---|
|
Design & Development Procedure
MC-ENG-001
|
Rev 3.2 | Current | Procedure | Nov 15, 2024 |
|
|
DFMEA Template & Procedure
MC-ENG-003
|
Rev 2.1 | Current | Form | Oct 30, 2024 |
|
|
Engineering Change Order Procedure
MC-ENG-005
|
Rev 4.0 | Current | Procedure | Sep 22, 2024 |
|
| Document | Version | Status | Category | Last Updated | Actions |
|---|---|---|---|---|---|
|
CNC Machining SOP
MC-PRD-001
|
Rev 7.0 | Current | Procedure | Dec 10, 2024 |
|
|
Sheet Metal Fabrication SOP
MC-PRD-002
|
Rev 5.3 | Current | Procedure | Nov 20, 2024 |
|
|
Injection Molding Process Control
MC-PRD-005
|
Rev 3.1 | Current | Procedure | Oct 15, 2024 |
|
| Document | Version | Status | Category | Last Updated | Actions |
|---|---|---|---|---|---|
|
Incoming Inspection Procedure
MC-INS-001
|
Rev 4.2 | Current | Procedure | Nov 05, 2024 |
|
|
CMM Measurement Procedure
MC-INS-003
|
Rev 2.8 | Current | Procedure | Oct 18, 2024 |
|
| Document | Version | Status | Category | Last Updated | Actions |
|---|---|---|---|---|---|
|
Supplier Evaluation Procedure
MC-PUR-001
|
Rev 3.5 | Current | Procedure | Nov 12, 2024 |
|
|
Approved Supplier List
MC-PUR-002
|
Rev 8.0 | Current | Record | Dec 18, 2024 |
|
Recent Document Updates
📋 Change Log — December 2024
Up to DateQuality Manual — Revision 5.2
Updated Section 7.1.5 Monitoring and Measuring Resources to align with new equipment calibration standards. Added references to ISO/IEC 17025 accredited labs.
CNC Machining SOP — Revision 7.0
Incorporated updated tooling changeover procedures and added digital work instruction integration steps for new MES system.
Approved Supplier List — Revision 8.0
Added 3 new approved suppliers for specialty alloys. Removed 2 suppliers that failed Q3 performance reviews. Updated contact information for existing vendors.
Internal Audit Procedure — Revision 2.4
Updated audit scheduling frequency per ISO 9001:2015 Clause 9.2. Added remote audit capability provisions and digital audit trail requirements.
Management Review Report — Q4 2024
Annual management review completed. All quality objectives met or exceeded. Customer satisfaction score improved to 97.3% (target: 95%). CAPA closure rate at 98.5%.